Training Outlines
Influence of design and injection point on the filling behavior
Pressure losses in gating systems, flow length / thickness ratio
Runner balance
Influence of design and gating point on shrinkage and warpage behavior
Material Data
Numerical Models
Filling and Packing Phase (plastic part)
Filling and Packing Phase (gating systems and mold aspects)
Cooling Analysis (mold)
Shrinkage and Warpage Calculation (part)
Case Studies from Röchling Automotive Practice
Check List for Simulations & Requirements for Specification Sheets
Final Discussions / Feedback
……….
Who should participate
Target audience group for this training is as following; Moldflow beginners and Moldflow users, project leaders / decision makers, part designers and tool constructors, tool makers and tool setters…
Duration
2 Days
Training Hours
09:00 – 17:00
Training Methodology
Training method will be following a power point with case studies on sample plastic parts and CAD/CAE softwares, open talks with audience.
Training Languages
This training is available both in Turkish and English
Price
Please ask